Construction of a household sewage treatment plant - formalities



The construction of a household sewage treatment plant is connected with the necessity to complete certain formalities. What should be prepared and how to proceed when planning to carry out this ecological investment?

The household sewage treatment plant requires legalization, by reporting the intention to build it. Otherwise, it can be considered as a construction permit, and the owner of the property will be charged with a fine up to a dozen or so thousand zlotys. Before taking steps to obtain approval for the construction of a treatment plant, one should decide on a specific type and choose the installation model that we are interested in.

Reporting the construction of a household treatment plant

Construction of a household wastewater treatment plant with a daily capacity of up to 7.5 m³ , and most often it is installed in single-family houses, it does not require obtaining a building permit. The intention to build a household sewage treatment plant, however, should be reported in the construction department responsible for the location of the poviat starosty investment. The notification should be made at least 30 days before the planned implementation of the sewage treatment plant. Approval of the construction of a household sewage treatment plant, requires meeting certain conditions, which may vary depending on the region of the country. If within 30 days from the date of filing, the county office does not object, it can be considered that the application has been considered positively, which means that it is possible to start construction.

Necessary for reporting the construction of a household sewage treatment plant

The first step to be taken when planning the construction of a household sewage treatment plant is to check in the poviat starosty whether there are local plans for the terrace, where our plots are located and whether they allow construction of a household sewage treatment plant. It will be necessary to prepare a situational and altitude map, on a scale of 1: 500 or 1: 1000, with the design of the sewage treatment plant along with the description. A map for the purposes of applying such a scheme can be downloaded in the geodesy department of the starosty, and the implementation of the sketch should be ordered by the company that will be the contractor of the investment. The proof of the right to dispose of the property, for construction purposes, technical documentation of the household sewage treatment plant, as well as the completed registration form should also be prepared in advance. If the treated wastewater is to be discharged to surface waters, then together with the application for the construction, it is necessary to also submit the consent of the owner of these waters for wastewater discharge and a water and legal service.